Half-time in dismantling the last high shelf. Now it won't be long before this one has disappeared completely. After that, our robot colleagues have even more space - we can't wait.
Step by step our new robot „colleagues“ asign every shelf its provided place.
Just a few days left and first goods in and out will be settled with the autonom logistic system.
Today 3 of the total of 120 robots were put into operation.
His job was to check that all QR code markings fit.
The first test has been completed successfully.
In the future Human and robot will work hand in hand at the OEG Logistics at Hessisch Oldendorf. The Transport of all containers
will be done by autonomous mobile robots. In more than 2000 storage racks every product comes into one’s own.
The efficiency and occuptional safety will make massive strides and every customer receives his good accurately timed.